BLOG

Welcome

BLOG

Posted 2022-05-14 by Dholera Greenfield Smart City

Ahmedabad-Dholera Sir Light Rail Project & Metro

Gujarat Government has given its approval to the state’s first Light Rail (Monorail) project between Ahmedabad and Dholera SIR . According to the draft project report, the project is estimated to be Rs 6,000 crores. This MRTS project is expected to be completed in 24 to 36 months after the work begins.

Ahmedabad-Dholera SIR Light Rail Project & Metro

Gujarat Government has given its approval to the state’s first Light Rail (Monorail) project between Ahmedabad and Dholera SIR . According to the draft project report, the project is estimated to be Rs 6,000 crores. This MRTS project is expected to be completed in 24 to 36 months after the work begins.

The government has secured the approval for financial and technical assistance for the project under the Government of India’s DMIC Corridor (Delhi-Mumbai Industrial Corridor) project. However, route alignment, stations plan, and other technical and financial proposals have got approval from both the Central Government also.

The detailed project report (DPR) for Ahmedabad - Dholera Light Rail Project has been prepared by the Railway Consultancy Firm RITES Limited.

After getting nodes from both the Centre and State government, the state government is seeking financial assistance from the Japan International Cooperation Agency (JICA).

The land acquisition for the project is over along with that for the Ahmedabad-Dholera Expressway project of the National Highways Authority of India. The monorail will be an elevated structure parallel to the expressway.

A total of eight stations are proposed on this light rail corridor. Of which seven will be elevated and one will be at grade. The proposed stations will be built at Visalpur, Dholka Chainage, Vataman Chainage, Pipli, Navagam, Ambli, Kadipur and Dholera CBD.

The project work is expected to start along with the expressway project in consultation with the Centre in two to three months. The project could take 24 to 36 months.

The Ahmedabad - Dholera SIR Light Rail Project will be Gujarat's first LRTS.

High-Speed Metro And Rail Ahmedabad:

A proposal to develop a high-speed metro rail that shall pass through Ahmedabad-Dholera-Gandhinagar was submitted under the DMIC master plan and approved by the central government. The project intends to augment the regional connectivity with Gujarat Dholera Smart City and develop a high-speed urban transport system that shall link Gujarat to the international airport, urban centers, main railway stations, and bus depots of Dholera. Linking up the metro with Dholera international airport shall play a vital role in the success of the airport.

The smart city Dholera metro project is expected to be a carrier of 80,000 passengers per hour (40,000 in each direction) and 1.70 million commuters are expected to use it by the year 2031.

Dholera Greenfield Smart City mainly deals in Commercial, Industrial, and Residential Land and Projects.

Booking & Enquiry Call: - 8866333000.

For More Info Please Visit Our Site:  https://aamanigroup.com/